Monday, September 14, 2009
Friday, September 11, 2009
Murphy Oil denied the accusations and said that the pipe is not theirs.
Refinery flooding neighborhood
story on WDSU TV tonight.
Whodunit?
Murphy Oil denied the accusations and said that the pipe is not theirs.
Ok Murphy Oil, if you didnt hire a backhoe, move all the employees vehicles, dig up the EXXON-Houston Pipelines and install the "Home Depot" type of unauthorized drainage, does that mean you have a security problem? would it help to make Basic Fence Repairs ?
Shouldnt you at least be concerned that your processing campus is flooding into our residential neighborhood? Meanwhile, the Murphy Oil refinery processing campus drains into the neighborhood canal because the refinery's open ditch overflows. This pollution, along with storm water runoff from the contaminated tank farms, fouls the Jacob and 20 arpent neighborhood canals. Murphy Oil should fix it already instead of denial.
story on WDSU TV tonight.
Whodunit?
Murphy Oil denied the accusations and said that the pipe is not theirs.
Ok Murphy Oil, if you didnt hire a backhoe, move all the employees vehicles, dig up the EXXON-Houston Pipelines and install the "Home Depot" type of unauthorized drainage, does that mean you have a security problem? would it help to make Basic Fence Repairs ?
Shouldnt you at least be concerned that your processing campus is flooding into our residential neighborhood? Meanwhile, the Murphy Oil refinery processing campus drains into the neighborhood canal because the refinery's open ditch overflows. This pollution, along with storm water runoff from the contaminated tank farms, fouls the Jacob and 20 arpent neighborhood canals. Murphy Oil should fix it already instead of denial.
buyout for establishment of green belt around refinery
August 3 2009 document on Murphy Oil Crude Oil spill
http://edms.deq.louisiana.gov/app/doc/view.aspx?doc=6503178&ob=yes&child=yes
August 8 2009 constituent correspondence Murphy Oil Crude Oil spill
http://edms.deq.louisiana.gov/app/doc/view.aspx?doc=6560889&ob=yes&child=yes
September 11 2009 agency response to constituent
http://edms.deq.louisiana.gov/app/doc/view.aspx?doc=6560891&ob=yes&child=yes
…”a buyout program for the establishment of a green belt around the refinery…”
http://edms.deq.louisiana.gov/app/doc/view.aspx?doc=6503178&ob=yes&child=yes
…”a buyout program for the establishment of a green belt around the refinery…”
August 8 2009 constituent correspondence Murphy Oil Crude Oil spill
http://edms.deq.louisiana.gov/app/doc/view.aspx?doc=6560889&ob=yes&child=yes
September 11 2009 agency response to constituent
http://edms.deq.louisiana.gov/app/doc/view.aspx?doc=6560891&ob=yes&child=yes
…”a buyout program for the establishment of a green belt around the refinery…”
Friday, September 4, 2009
Monday, August 17, 2009
Murphy Oil's SO2 calculations deficient
Murphy Oil presented netting calculations that suggest incorrectly that the net increase in emissions from these modifications is below Clean Air Act Prevention of Significant Deterioration (PSD) significance thresholds and thus do not trigger New Source Review (NSR).
Murphy Oil's SO2 emissions calculations incorrect
Murphy Oil's SO2 emissions calculations incorrect
The proposed permit seeks to use gasoline tanks with fixed roof(s), to route the BenFree Unit (BFU) to an inadequate gas recovery system, and to route H2S rich vent streams to the flare. To protect public health and safety, Louisiana DEQ must require stringent application of the best available controls to achieve the lowest emissions into the air we breathe.
Wednesday, August 5, 2009
MRGO Wetland Restoration
Community Forum
Tuesday August 11th 6:30pm Council on Aging Building
http://mrgomustgo.org/newsletter/chalmette809.pdf
The Mississippi River Gulf Outlet has always
been a great concern to St. Bernard
Parish. Today, the MRGO is closed to
navigation, but the most critical step toward
protection remains.
Tuesday August 11th 6:30pm Council on Aging Building
http://mrgomustgo.org/newsletter/chalmette809.pdf
The Mississippi River Gulf Outlet has always
been a great concern to St. Bernard
Parish. Today, the MRGO is closed to
navigation, but the most critical step toward
protection remains.
Monday, August 3, 2009
Air Emission Update
May 24, 2009 -- 4,000 pounds of SO2 in 30 minutes ---
Hydrocracker automatic safety shutdown
"This level of emissions would not be expected to cause adverse offsite impact, and no allegations of impact were received from neighbors in the surrounding community." The incident is still under investigation LA EDMS 42133553
February 25, 2009 -- 35,000 pounds of heavy hydrocarbon within 5 minutes ------
FCCU Reversal
"The episode resulted in estimated emissions of 35,000 pounds of heavy hydrocarbon vapors, 5,165 pounds of catalyst, and 1,1750 pounds of particulates as smoke."LA DEQ EDMS 40817686
Hydrocracker automatic safety shutdown
"This level of emissions would not be expected to cause adverse offsite impact, and no allegations of impact were received from neighbors in the surrounding community." The incident is still under investigation LA EDMS 42133553
February 25, 2009 -- 35,000 pounds of heavy hydrocarbon within 5 minutes ------
FCCU Reversal
"The episode resulted in estimated emissions of 35,000 pounds of heavy hydrocarbon vapors, 5,165 pounds of catalyst, and 1,1750 pounds of particulates as smoke."LA DEQ EDMS 40817686
Subscribe to:
Posts (Atom)